pmm60-integrated-servo-motor-factory.jpg
PMM60 Integrated DC Servo Motor (4 images/videos)
PMM60

PMM60 Integrated DC Servo Motor

60mm flange integrated servo motor – integrates drive, control, and I/O, redefining traditional servo systems. Simplifies wiring, saves space, and delivers smarter integrated solutions for a wide range of compact automation equipment.

Features

  • 60mm flange size
  • Precise control and stable operation
  • 200W / 400W

Models & Specifications

Specs as rows · Models as columns
SpecificationsPMM6020B-CANopen-0HEPMM6020B-485-0HEPMM6020B-COE-0HEPMM6020B-CANopen-0HEBPMM6020B-485-0HEBPMM6020B-COE-0HEBPMM6020B-CANopen-0HE-LPPMM6020B-485-0HE-LPPMM6020B-COE-0HE-LPPMM6020B-CANopen-0HEB-LPPMM6020B-485-0HEB-LPPMM6020B-COE-0HEB-LPPMM6040B-CANopen-0HEPMM6040B-485-0HEPMM6040B-COE-0HEPMM6040B-CANopen-0HEBPMM6040B-485-0HEBPMM6040B-COE-0HEBPMM6040B-CANopen-0HE-LPPMM6040B-485-0HE-LPPMM6040B-COE-0HE-LPPMM6040B-CANopen-0HEB-LPPMM6040B-485-0HEB-LPPMM6040B-COE-0HEB-LP
Flange Size60mm60mm60mm60mm60mm60mm60mm60mm60mm60mm60mm60mm60mm60mm60mm60mm60mm60mm60mm60mm60mm60mm60mm60mm
BrakeNo BrakeNo BrakeNo BrakeIntegrated Brake (Ext. Interface)Integrated Brake (Ext. Interface)Integrated Brake (Ext. Interface)No BrakeNo BrakeNo BrakeIntegrated Brake (Ext. Interface)Integrated Brake (Ext. Interface)Integrated Brake (Ext. Interface)No BrakeNo BrakeNo BrakeIntegrated Brake (Ext. Interface)Integrated Brake (Ext. Interface)Integrated Brake (Ext. Interface)No BrakeNo BrakeNo BrakeIntegrated Brake (Ext. Interface)Integrated Brake (Ext. Interface)Integrated Brake (Ext. Interface)
Encoder type2500-line single-turn absolute magnetic encoder2500-line single-turn absolute magnetic encoder2500-line single-turn absolute magnetic encoder2500-line single-turn absolute magnetic encoder2500-line single-turn absolute magnetic encoder2500-line single-turn absolute magnetic encoder2500-line single-turn absolute magnetic encoder2500-line single-turn absolute magnetic encoder2500-line single-turn absolute magnetic encoder2500-line single-turn absolute magnetic encoder2500-line single-turn absolute magnetic encoder2500-line single-turn absolute magnetic encoder2500-line single-turn absolute magnetic encoder2500-line single-turn absolute magnetic encoder2500-line single-turn absolute magnetic encoder2500-line single-turn absolute magnetic encoder2500-line single-turn absolute magnetic encoder2500-line single-turn absolute magnetic encoder2500-line single-turn absolute magnetic encoder2500-line single-turn absolute magnetic encoder2500-line single-turn absolute magnetic encoder2500-line single-turn absolute magnetic encoder2500-line single-turn absolute magnetic encoder2500-line single-turn absolute magnetic encoder
Rated Speed3000 rpm3000 rpm3000 rpm3000 rpm3000 rpm3000 rpm3000 rpm3000 rpm3000 rpm3000 rpm3000 rpm3000 rpm3000 rpm3000 rpm3000 rpm3000 rpm3000 rpm3000 rpm3000 rpm3000 rpm3000 rpm3000 rpm3000 rpm3000 rpm
Rated Power200 W200 W200 W200 W200 W200 W200 W200 W200 W200 W200 W200 W400 W400 W400 W400 W400 W400 W400 W400 W400 W400 W400 W400 W
Rated Voltage48 VDC48 VDC48 VDC48 VDC48 VDC48 VDC48 VDC48 VDC48 VDC48 VDC48 VDC48 VDC48 VDC48 VDC48 VDC48 VDC48 VDC48 VDC48 VDC48 VDC48 VDC48 VDC48 VDC48 VDC
Inertia1.9×10^-5 kg·m²1.9×10^-5 kg·m²1.9×10^-5 kg·m²1.9×10^-5 kg·m²1.9×10^-5 kg·m²1.9×10^-5 kg·m²1.9×10^-5 kg·m²1.9×10^-5 kg·m²1.9×10^-5 kg·m²1.9×10^-5 kg·m²1.9×10^-5 kg·m²1.9×10^-5 kg·m²2.5×10^-5 kg·m²2.5×10^-5 kg·m²2.5×10^-5 kg·m²2.5×10^-5 kg·m²2.5×10^-5 kg·m²2.5×10^-5 kg·m²2.5×10^-5 kg·m²2.5×10^-5 kg·m²2.5×10^-5 kg·m²2.5×10^-5 kg·m²2.5×10^-5 kg·m²2.5×10^-5 kg·m²
Voltage Range16-5216-5216-5216-5216-5216-5216-5216-5216-5216-5216-5216-5216-5216-5216-5216-5216-5216-5216-5216-5216-5216-5216-5216-52
Protection LevelIP54IP54IP54IP54IP54IP54IP54IP54IP54IP54IP54IP54IP54IP54IP54IP54IP54IP54IP54IP54IP54IP54IP54IP54
STO FunctionNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNo
Body Length115 mm115 mm115 mm147 mm147 mm147 mm115 mm115 mm115 mm147 mm147 mm147 mm145 mm145 mm145 mm177 mm177 mm177 mm145 mm145 mm145 mm177 mm177 mm177 mm
Weight1.1 kg1.1 kg1.1 kg1.5 kg1.5 kg1.5 kg1.1 kg1.1 kg1.1 kg1.5 kg1.5 kg1.5 kg1.6 kg1.6 kg1.6 kg2.0 kg2.0 kg2.0 kg1.6 kg1.6 kg1.6 kg2.0 kg2.0 kg2.0 kg
Rated Current8 A8 A8 A8 A8 A8 A8 A8 A8 A8 A8 A8 A12 A12 A12 A12 A12 A12 A12 A12 A12 A12 A12 A12 A

* Scroll horizontally within the table area when the content is wide.

Specifications

Shaft DiameterΦ14
Drive ModeFOC magnetic field directional control technology and SVPWM
Encoder2500-line single-turn absolute magnetic encoder
CiA402 ModePP, VM, PV, PT, HM, IP, CSP, CSV, CST
NiMotion modePosition mode: Pulse control, multi-segment position control, digital input control Speed mode: Multi-segment speed control, digital input control Torque mode: Digital input control
Control ModesCiA402 Mode,Manufacturer Mode
External Control InterfaceDI – Non-isolated NPN Input,DI – Non-isolated PNP Input,DI – Non-isolated Switch Input,DO – Non-isolated MOSFET Output,AI – 0–10V Analog Input
DI (Digital Input)Quantity: 3, non-isolated, pull-up configurable via object 2003h:15h; High level: 3~30V, Low level: 0~0.5V. Configurable functions: 1. Used as switch input; 2. Used as pulse input channel.
DO (Digital Output)Configurable via DX
DX (Digital Input / Output)Quantity: 1; Configured as DO; Maximum load current: 8mA; Configurable functions: 1. General DO; 2. Motor run/stop; 3. Target reached; 4. Alarm output (DO switching state changes when motor status meets the above conditions).
AI (Analog Input)Quantity: 1; Input method: single-ended input; Signal type: voltage signal; Resolution: 12-bit; Voltage: 0~10V; Accuracy: reference error ≤1%; Configurable functions: dead zone, filtering, offset, scaling, direction.
Operating Temperature0°C to 40°C
Operating Altitude<1000m
Fault AlarmOvervoltage, undervoltage, overtemperature, locked rotor, overload, overspeed
Servo FunctionSoft limit, gain switching, S-curve planning, vibration suppression, parameter identification, online upgrade

Torque-Speed Characteristics

PMM6020B-COE/CANopen/485-X

PMM6040B-COE/CANopen/485-X

Product Details

PMM60

The PMM60 series of integrated low-voltage servo motors is a servo product newly developed by NiMotion. Based on the concept of highly compact integrated development, this product integrates a permanent magnet synchronous motor, a single-turn absolute encoder, a bus-type servo drive and digital I/O. It adopts FOC (field-oriented control) and SVPWM, supports EtherCAT, CANopen and RS485 bus control, and has the characteristics of compact structure and simple wiring.


Product Features

Highly integrated design

Integrates Permanent magnet synchronous motor, single turn absolute encoder, bus-type servo drive and digital I/O into a single compact unit, so no external drive is required. Compared with conventional separated solutions it saves considerable installation space, needs less wiring, and makes commissioning and maintenance easier.


Advanced Drive Algorithm

Adopts FOC (field-oriented control) and SVPWM for smooth torque output, excellent low-speed performance and lower operating noise and vibration.


High Precision Encoder Feedback

Built-in 2500-wire encoder provides real-time position and speed feedback for more accurate closed-loop control, ensuring smoother operation and more accurate positioning.


Multi-bus communication support

Multi-bus

Supports EtherCAT, CANopen and RS485 communication, allowing quick connection to mainstream PLCs, motion controllers and host systems, with flexible networking and easy expansion.


Wide Voltage Input

Wide input voltage range of 16-52 VDC, suitable for various power-supply environments and giving greater flexibility in system integration and retrofitting.


Digital Inputs / Outputs

Built-in digital inputs and outputs (DI/DO) that can be configured for enable, forward/reverse limit switches, home sensor, alarm output, brake control and more, allowing direct interfacing with sensors and PLCs without additional I/O modules and simplifying field wiring.


Homing and Origin Setting

Homing and Origin Setting

Multiple homing (origin return) modes with configurable homing direction, speed and origin offset, allowing the mechanical origin to be re-established quickly after power loss or an abnormal stop and ensuring repeat positioning accuracy.


Multiple Control Modes

Multiple Control Modes

Supports multiple control modes and standard CiA 402 motion modes (PP, PV, HM, CSP, etc.), switchable via fieldbus, pulse train, analog input or digital I/O to suit different host systems.


Gain Switching

Several gain sets can be stored and switched, with online auto-tuning available. Gains can be changed automatically or manually according to load inertia and operating speed, balancing fast response with smooth low-speed operation for quicker commissioning.


16-segment Position / Velocity & S-curve

16-segment Position / Velocity & S-curve Planning

A built-in 16-segment position and velocity instruction function combined with S-curve acceleration/deceleration planning enables smooth multi-point positioning with reduced start/stop shock and mechanical vibration, improving cycle time and motion smoothness.


Resonance Suppression

Resonance Suppression

Resonance suppression automatically identifies and sets mechanical resonance frequencies and uses notch filtering to suppress mid- and high-frequency resonance, reducing operating noise and improving positioning stability and path accuracy.


Low-frequency Vibration Suppression

Low-frequency Vibration Suppression

Low-frequency vibration suppression compensates the residual sway of long arms, belts and other flexible loads, giving faster settling and more stable positioning in high-speed point-to-point applications.

Downloads

NameTypeSizeUpdate DateDownload
NiMotion Integrated Motor Selection Guide
Selection Guide58.5MB2026-10-14
pmm-series-ethercat-canopen-rs485-User Manual
User Manual1.4MB2026-09-10
Communication Manual – Servo-EtherCAT
Communication Manual3.7MB2026-08-25
Communication Manual – Servo-modbus
Communication Manual4.1MB2026-08-13
Communication Manual – Servo-CANopen
Communication Manual3.8MB2026-08-25
pmm60xxb-xxx-0he-b-lp-integrated-low-voltage-servo-motor
Drawing241.7KB2026-07-28
pmm60xxb-xxx-0he-b-integrated-low-voltage-servo-motor-standard
Drawing235.0KB2026-07-28
pmm6020b-xxx-l-0he-b-integrated-low-voltage-servo-motor
Drawing277.0KB2026-07-28

Companion Products

VDDX001P Power Cable
Power CableVDDX001P Power Cable

Power cable for NiMotion integrated motors.

View Details
VDCX003P Communication Cable(COE)
Communication CableVDCX003P Communication Cable(COE)

Communication cable for NiMotion integrated motors.

View Details
VDCX005P Communication Cable(COE)
Communication CableVDCX005P Communication Cable(COE)

Communication cable for NiMotion integrated motors.

View Details
VDCX008P Communication Cable(CAN/RS485)
Communication CableVDCX008P Communication Cable(CAN/RS485)

Communication cable for NiMotion integrated motors.

View Details
VDCX009P Communication Cable(CAN/RS485)
Communication CableVDCX009P Communication Cable(CAN/RS485)

Communication cable for NiMotion integrated motors.

View Details
SCM-USBCANI-L
Communication ConverterSCM-USBCANI-L

USB to CAN converter with isolation, IP65 protection, and secondary development SDK support.

View Details
SCM-USB485A-L
Communication ConverterSCM-USB485A-L

USB to RS485 converter with active termination, isolation, IP65 protection, and secondary development SDK support.

View Details
VDIX002P IO Cable
I/O CableVDIX002P IO Cable

IO cable for NiMotion integrated motors.

View Details
VDCX010P Communication Cable
Communication CableVDCX010P Communication Cable

Communication cable for NiMotion integrated motors.

View Details

Applications

Discover how this product is applied across various industrial automation scenarios.

Compatible Products

Build complete and reliable solutions with our compatible products.

Ready to start your automation project?

Talk to our engineers and get a customized motion control solution within 24 hours.

Typical response time: 24 hours